1%AEP with Climate Change (0)
sens01 - Increase in Manning's n in the channel by 20% (1)
| -0.5 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens02 - Decrease in Manning's n in the channel by 20% (2)
| -5.1 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens03 - Increase in Manning's n on the floodplain by 20% (3)
| -6 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens04 - Decrease in Manning's n on the floodplain by 20% (4)
| -5.7 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens05 - Antecedent peak 25% of flood peak (5)
| -0.9 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens06 - Antecedent peak 50% of flood peak (6)
| -2.8 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens07 - Increase in Ruamahanga flow by 20% (7)
| -6 - 0m |
| 0m |
| 0 - 0.1 |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens08 - Decrease in Ruamahanga flow by 20% (8)
| -7.9 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens09 - Grade control weirs completely removed (3 weirs) (9)
| -2.9 - 0m |
| 0m |
| 0 - 0.1 |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens10 - Addition of 4th weir downstream of colombo road (10)
| -6 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens11 - 10% blockage of the right span of the rail bridge (11)
| -2.3 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens12 - 20% blockage of the right span of the rail bridge (12)
| -8.5 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens13 - Use 1998 channel cross sections for bed level variation (13)
| -16 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens14 - Mikimiki upper + recommended ungauged 25% (14)
| -0.6 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens15 - Mikimiki lower + recommended ungauged 25% (15)
| -9.3 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens16 - Mikimiki recommended + ungauged 15% (16)
| -2.8 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1m - 2m |
| 2m + |
sens17 - Mikimiki recommended + ungauged 35% (17)
| -3.7 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
sens18 - Mikimiki recommended + ungauged 45% (18)
| -2 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens19 - Mikimiki upper + baseline ungauged contribution (19)
| -3.5 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens20 - 19% climate change (20)
| -2.6 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens21 - 0.5m freeboard added to 1D (channel) results (21)
| -0.80 - 0m |
| 0m |
| 0 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
sens22 - 0.3m freeboard added to 1D (channel) results (22)
| -0.9 - 0m |
| 0m |
| 0.001 - 0.1m |
| 0.1 - 0.3m |
| 0.3 - 0.5m |
| 0.5 - 1m |
| 1 - 2m |
| 2m + |
Road Centreline (23)
|